Time-Cost Optimization of Building Projects - Uzair Waheed

Time-Cost Optimization of Building Projects

(Autor)

Buch | Softcover
95 Seiten
2015
Project Management Institute (Verlag)
978-1-62825-086-2 (ISBN)
24,80 inkl. MwSt
Traditional wisdom suggests that when it comes to construction projects, any effort that might be made to shorten the planned schedule will necessarily lead to increased costs. In Time-Cost Optimization of Building Projects, however, Uzair Waheed shows that it might just be possible, under certain conditions, to actually decrease both time and cost for building projects.
Traditional wisdom suggests that when it comes to construction projects, any effort that might be made to shorten the planned schedule will necessarily lead to increased costs. In Time-Cost Optimization of Building Projects, however, author Uzair Waheed, B.E., PMP shows that it might just be possible, under certain conditions, to actually decrease both time and cost for building projects.
Erscheint lt. Verlag 1.8.2015
Verlagsort Newton Square, PA
Sprache englisch
Maße 152 x 229 mm
Gewicht 212 g
Themenwelt Technik Bauwesen
Technik Maschinenbau
Wirtschaft Betriebswirtschaft / Management Projektmanagement
Wirtschaft Betriebswirtschaft / Management Unternehmensführung / Management
ISBN-10 1-62825-086-0 / 1628250860
ISBN-13 978-1-62825-086-2 / 9781628250862
Zustand Neuware
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich
mit traditionellem, agilem und hybridem Vorgehen zum Erfolg

von Holger Timinger

Buch | Softcover (2024)
Wiley-VCH (Verlag)
39,90
Agil – Klassisch – Hybrid

von Jürg Kuster; Christian Bachmann; Mike Hubmann …

Buch | Hardcover (2022)
Springer Gabler (Verlag)
59,99