Critical Path Method (CPM) Tutor for Construction Planning and Scheduling - William East

Critical Path Method (CPM) Tutor for Construction Planning and Scheduling

(Autor)

Buch | Hardcover
224 Seiten
2015
McGraw-Hill Professional (Verlag)
978-0-07-184923-4 (ISBN)
107,20 inkl. MwSt
This unique tool provides a fresh approach to construction scheduling by focusing on ways in which the Critical Path Method (CPM) can be used to manage construction project schedules to meet today’s ever-increasing demands to improve operational efficiency and increase profitability.
Publisher's Note: Products purchased from Third Party sellers are not guaranteed by the publisher for quality, authenticity, or access to any online entitlements included with the product.
Speed progress payments, reduce claims, and increase profitability using the Critical Path MethodCritical Path Method (CPM) Tutor for Construction Planning and Scheduling explains the practical application of the CPM and guides you through each step of the process—from planning and communication to deciding payment and/or claims. The book focuses on the Arrow Diagram Method and the Precedence Diagram Method, the two most widely used scheduling methods.

A sample project for planning a mid-rise building applies the concepts presented in the book. Hands-on exercises and discussions illustrate how to create schedules from activity lists. The effective and consistent use of the techniques introduced in this detailed guide will allow you to:



Reduce progress payment disputes and speed progress payment
Plan resources for maximum productivity
Predict owner-caused and weather delays
Develop “get well” plans for projects that fall behind
Correctly update progress, including out-of-sequence activities
Meet contracts requiring CPM schedules
Evaluate change and claim impacts; develop admissible documentation

William East, PhD, PE, F.ASCE, has worked for the U.S. Army Corps of Engineers over the past three decades, first as a project engineer and then as a research program manager. His evaluation of the first PC-based scheduling systems resulted in the Standard Data Exchange Format, which delivers earned-value loaded schedules on Corps of Engineers’ projects. Dr. East’s website is cpmTutor.com.

Ch 1 Preface
Ch 2 Why Scheduling
Ch 3 History of Project Planning
Ch 4 Arrow Diagram Method
Ch 5 Precedence Diagram Method
Ch 6 Effective Scheduling
Ch 7 Advanced Topics
Ch 8 A Worked Example
Ch 9 Glossary
Ch 10 Questions and Answers

Zusatzinfo 125 Illustrations, unspecified
Sprache englisch
Maße 152 x 236 mm
Gewicht 476 g
Themenwelt Technik Bauwesen
Wirtschaft Betriebswirtschaft / Management Projektmanagement
ISBN-10 0-07-184923-8 / 0071849238
ISBN-13 978-0-07-184923-4 / 9780071849234
Zustand Neuware
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich
Agil – Klassisch – Hybrid

von Jürg Kuster; Christian Bachmann; Mike Hubmann …

Buch | Hardcover (2022)
Springer Gabler (Verlag)
59,99
mit traditionellem, agilem und hybridem Vorgehen zum Erfolg

von Holger Timinger

Buch | Softcover (2024)
Wiley-VCH (Verlag)
39,90