Basics Construction Scheduling
Birkhäuser Verlag GmbH
978-3-7643-8873-7 (ISBN)
Dr.-Ing. Bert Bielefeld ist praktizierender Architekt und Inhaber des Architekturbüros bertbielefeld architekten.
Dr.-Ing. Bert Bielefeld is a practicing architect and owner of the architecture firm bertbielefeld architekten.
lt;p>Table of Contents:
Foreword
Introduction
Organizing the Planning and Construction Process
Coordinating Schedule Development
Coordinating the Pre-Implementation Phase
Coordinating the Construction Process
Preparing a Schedule
Components of a Schedule
Presentation Formats
Levels of Detail
Preparing an Overall Schedule
Structure of a Project-Oriented Schedule
The Participant's Activities
Scheduling Activity Durations
Scheduling Workflows
Working with a Schedule
Updating and Maintaining a Schedule
Usability in the Everyday Work Environment
Disruptions to the Construction Process
Making Up for Disruptions
Scheduling as Documentation of the Process
Closing Remarks
Appendix
Erscheint lt. Verlag | 17.10.2008 |
---|---|
Reihe/Serie | Basics | Basics (englisch) |
Zusatzinfo | 48 b/w ill., 6 b/w tbl. |
Verlagsort | Basel/Berlin/Boston |
Sprache | englisch |
Original-Titel | Basics Terminplanung |
Maße | 155 x 220 mm |
Gewicht | 205 g |
Themenwelt | Technik ► Architektur |
Schlagworte | Architectural student handbook • Architecture • Architektur; Handbuch/Lehrbuch • Basics series • construction planning • Construction process • Hardcover, Softcover / Kunst/Architektur • HC/Kunst/Architektur • Professional Practice • Project Planning • Scheduling • Textbook architecture • Zeitplanung |
ISBN-10 | 3-7643-8873-0 / 3764388730 |
ISBN-13 | 978-3-7643-8873-7 / 9783764388737 |
Zustand | Neuware |
Haben Sie eine Frage zum Produkt? |
aus dem Bereich