The Messina Strait Bridge - Fabio Brancaleoni, Giorgio Diana, Ezio Faccioli, Giuseppe Fiammenghi, Ian P.T. Firth

The Messina Strait Bridge

A Challenge and a Dream
Buch | Hardcover
334 Seiten
2009
CRC Press (Verlag)
978-0-415-46814-5 (ISBN)
137,15 inkl. MwSt
When completed, the Messina Straight bridge will stand as one of the world's longest single span bridge and as a benchmark for future projects with longer spans. This book focuses not only on the design itself, but also on the context in which the project is located and the great challenges involved.
This book describes the enormous depth of work carried out since the early 1970s on the Messina Strait Bridge, up to the recent award of the detailed design and construction contract. This important work has included extensive studies, concepts and design developments, with far reaching applications, which have all confirmed the feasibility of this huge endeavour and have led to the optimisation of costs and expected performance levels.

Attention is focused not only on the design itself, but also on the context for the project (e.g. historical, geological, seismo-tectonic and wind conditions; structural and mechanical properties; project management and financial aspects; and environmental considerations), and on the great challenges involved. Thus, considering the innovations and specific solutions adopted in overcoming the challenges presented by constructing a world record span of 3,300 metres at this site, it becomes clear how the Messina Strait Crossing will take its place as a masterpiece in bridge engineering history.

This book will be of interest to bridge and structural engineers, geotechnical and wind engineers, mechanical and earthquake engineers, graduate students in all these areas and all others with a broad interest in bridge design and engineering.

Fabio Brancaleoni, Giorgio Diana, Ezio Faccioli, Giuseppe Fiammenghi, Ian P.T. Firth, Niels J. Gimsing, Michele Jamiolkowski,, Peter Sluszka, Giovanni Solari, Gianluca Valensise

Preface. Introduction. History and Context. Project Delivery Model. Project Finance. Environment. The Crossing Site. Challenges of a Super Long Suspension Bridge. Design of the Bridge. The Way Ahead. Fact Files. References.

Erscheint lt. Verlag 23.9.2009
Verlagsort London
Sprache englisch
Maße 210 x 297 mm
Gewicht 920 g
Themenwelt Technik Bauwesen
ISBN-10 0-415-46814-0 / 0415468140
ISBN-13 978-0-415-46814-5 / 9780415468145
Zustand Neuware
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich
Grundlagen und Vorgehensweisen

von Bernd Kochendörfer; Jens H. Liebchen; Markus G. Viering

Buch | Softcover (2021)
Springer Fachmedien Wiesbaden GmbH (Verlag)
37,99
Bemessung von Stahlbauten nach Eurocode mit zahlreichen Beispielen

von Jörg Laumann; Christian Wolf

Buch | Hardcover (2024)
Springer Vieweg (Verlag)
59,99
Kommentar zu VOB/C ATV DIN 18340, ATV DIN 18299

von Volker Mänz; Thomas Schmid; Markus Weißert

Buch | Softcover (2024)
DIN Media (Verlag)
69,00