Project Execution of Mega-Projects for the Oil and Gas Industries
CRC Press (Verlag)
978-0-367-67526-4 (ISBN)
This book covers execution of mega industrial projects especially in oil and gas industries covering engineering, procurement, construction, commissioning and performance testing. It enumerates various tasks and deliverables under each discipline and sub-disciplines to define the detailed scope of work, supplies and services, as per level III of Prima Vera Schedule developed from the contract-based schedule. It gives an overall idea of how a project rolls out from commencement date to initial acceptance and executed practically with total contractor’s scope of work broken down into tasks/activities at level III platform, while highlighting that support for fool proof project execution.
Soosaiya Anthreas graduated from CIT in Mechanical Engineering. He has thirty four years of experience from mega industrial projects in the field of project development, project management and project construction. He worked in global EPC companies like Samsung Engineering and Technip FMC. As a weekend novelist, he published his first literary fiction novel, The Dance of the Sea. He lives in Chennai with wife and son..
SECTION I PLANNING AND EXECUTION IN LEVEL 3. 1. Management, Control and Administration. 2. HSE, Social and Security. 3. Services and Facilities to Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning, Start-up and Performance Test. 10. Temporary Facilities. SECTION II COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12. Extension of Time. 13. Professionally Handling Large Claims. 14. Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays. 16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25. Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29. Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract Price below Floor Price and Consequences. 32. Owner’s Delay on Document Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells (Owner Delays). 36. Strategy for using Non-Spec Feedstock for Commissioning. 37. Gas In and Authority Check points. 38. Value Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT (Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2. Contract Price Weight Factor. 3. Monthly Status Report Contents. 4. Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter. 9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of Procedures and Plans. 11. Total Plant Break down into Areas.
Erscheinungsdatum | 28.09.2023 |
---|---|
Zusatzinfo | 20 Tables, black and white; 7 Illustrations, black and white |
Verlagsort | London |
Sprache | englisch |
Maße | 156 x 234 mm |
Gewicht | 453 g |
Themenwelt | Technik ► Bauwesen |
Technik ► Elektrotechnik / Energietechnik | |
Wirtschaft ► Betriebswirtschaft / Management ► Projektmanagement | |
ISBN-10 | 0-367-67526-9 / 0367675269 |
ISBN-13 | 978-0-367-67526-4 / 9780367675264 |
Zustand | Neuware |
Informationen gemäß Produktsicherheitsverordnung (GPSR) | |
Haben Sie eine Frage zum Produkt? |
aus dem Bereich