Shield Tunnel Cutter Replacement Technology
Springer Verlag, Singapore
978-981-16-4109-1 (ISBN)
Jian Chen, professor-level senior engineer, Ph.D. at Ocean University of China. Deputy Chief Engineer and Chief Expert of China Railway 14th Bureau Group, a well-known domestic large shield expert, mainly engaged in technical management and scientific research of the large shield cross-river tunnel project. He was awarded the honorary title of "China Civil Engineering Zhan Tianyou Innovation Collective", "Mao Yisheng Railway Engineer", "Shandong Province Excellent Inventor", "Jiangsu Province Top Ten Staff Operation Law" and "Shandong Excellent Young Intellectuals". Successfully completed the construction of large-scale underwater tunnels such as the Nanjing Yangtze River Tunnel, the Yangzhou Slender West Lake Tunnel, and the Wuhan Metro Line 8 Cross-river Tunnel. The scientific and technological achievements of the research and development have reached international advanced and domestic leading level. He received 6 provincial and ministerial-level scientific and technologicalprogress first prizes, 2 second prizes; 1 national-level construction method, 5 provincial-level construction methods; 23 national patents authorized; 1 monograph published; published core and above scientific papers 14 Article. Fanlu Min, Ph.D., associate professor of Hohai University, master tutor, visiting scholar of Hong Kong University of Science and Technology, selected as a “big scholar” program at Hohai University. He is mainly engaged in research and teaching of underwater shield tunnels, urban subways, and other aspects. He has presided over 5 vertical projects such as the National Natural Science Foundation of China and the National 973 Program Sub-project, and presided over or participated in the Nanjing Yangtze River Tunnel, the Nanjing Weisan Road Crossing River Tunnel, the Yangzhou Slender West Lake Tunnel, the South-to-North Water Transfer Middle Line, the Yellow River Tunnel, and the Wuhan River Crossing Subway. More than 10 large-diameter underwater shield tunnels and technological innovations in urban subways. He won the first prize of provincial and ministerial level scientific and technological progress award; authorized 16 invention patents; published 1 monograph; published more than 60 papers, including 30 SCI/EI papers.
Introduction.- Cutting, Wear and Replacement of Cutting Tools During Shield Tunneling.- Conventional Cutterhead & Tool-Changing Under Normal Pressure Technology.- Normal Pressure Tool Change Technology Based on Basic Pressure and Changeable Knife Design.- Stabilization Technology and Tool Change Technology for Open Face with Pressure Open.- Other Special Tool Changing Techniques.
Erscheinungsdatum | 26.08.2022 |
---|---|
Reihe/Serie | Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions |
Zusatzinfo | 154 Illustrations, color; 93 Illustrations, black and white; XXIII, 308 p. 247 illus., 154 illus. in color. |
Verlagsort | Singapore |
Sprache | englisch |
Maße | 155 x 235 mm |
Themenwelt | Naturwissenschaften ► Geowissenschaften ► Geologie |
Naturwissenschaften ► Geowissenschaften ► Meteorologie / Klimatologie | |
Technik ► Bauwesen | |
ISBN-10 | 981-16-4109-9 / 9811641099 |
ISBN-13 | 978-981-16-4109-1 / 9789811641091 |
Zustand | Neuware |
Informationen gemäß Produktsicherheitsverordnung (GPSR) | |
Haben Sie eine Frage zum Produkt? |
aus dem Bereich