Preliminary Considerations Regarding NASA's Bioastronautics Critical Path Roadmap
Interim Report
Seiten
2005
National Academies Press (Verlag)
978-0-309-09523-5 (ISBN)
National Academies Press (Verlag)
978-0-309-09523-5 (ISBN)
- Keine Verlagsinformationen verfügbar
- Artikel merken
Extending the spatial and temporal boundaries of human space flight are important goals for the National Aeronautics and Space Administration (NASA), yet human space flight remains an endeavor with substantial risks. Potential hazards include exposure of the crew to space radiation, degraded crew performance related to human behavioral and other health changes, failure of life support systems, and the adverse effects of space flight on human biological systems. The Bioastronautics Critical Path Roadmap (BCPR) is designed to provide summary assessments of the importance of each risk, and the current state of science and technology with respect to minimizing them. Preliminary Considerations Regarding NASA's Bioastronautics Critical Path Roadmap assesses the strengths and weaknesses of the content and processes of the BCPR as applied to the missions described in the President's exploration initiative and identifies the unique challenges for accomplishing its goals and objectives.
Table of Contents
Front Matter
Interim Report
Appendix A Methods
Appendix B NASA. 2004. Bioastronautics Critical Path Roadmap
(BCPR): An Approach to Risk Reduction and Management for Human
Space Flight. Houston, TX: Lyndon B. Johnson Space Center
Appendix C Bibliography of Related National Academies Reports
Appendix D Committee and Staff Biographical Information
Table of Contents
Front Matter
Interim Report
Appendix A Methods
Appendix B NASA. 2004. Bioastronautics Critical Path Roadmap
(BCPR): An Approach to Risk Reduction and Management for Human
Space Flight. Houston, TX: Lyndon B. Johnson Space Center
Appendix C Bibliography of Related National Academies Reports
Appendix D Committee and Staff Biographical Information
Committee on Review of NASA's Bioastronautics Critical Path Roadmap
1 Front Matter; 2 Interim Report; 3 Appendix A Methods; 4 Appendix B NASA. 2004. Bioastronautics Critical Path Roadmap (BCPR): An Approach to Risk Reduction and Management for Human Space Flight. Houston, TX: Lyndon B. Johnson Space Center; 5 Appendix C Bibliography of Related National Academies Reports; 6 Appendix D Committee and Staff Biographical Information
Erscheint lt. Verlag | 28.1.2005 |
---|---|
Verlagsort | Washington |
Sprache | englisch |
Maße | 152 x 229 mm |
Themenwelt | Naturwissenschaften ► Physik / Astronomie ► Angewandte Physik |
Naturwissenschaften ► Physik / Astronomie ► Astronomie / Astrophysik | |
ISBN-10 | 0-309-09523-9 / 0309095239 |
ISBN-13 | 978-0-309-09523-5 / 9780309095235 |
Zustand | Neuware |
Haben Sie eine Frage zum Produkt? |
Mehr entdecken
aus dem Bereich
aus dem Bereich
Buch | Softcover (2021)
Springer Fachmedien Wiesbaden GmbH (Verlag)
27,99 €