Spon's Estimating Costs Guide to Plumbing and Heating - Bryan J. D. Spain, Bryan Spain

Spon's Estimating Costs Guide to Plumbing and Heating

Unit Rates and Project Costs, Fourth Edition
Buch | Hardcover
244 Seiten
2017 | 4th edition
Spon Press (Verlag)
978-1-138-40858-6 (ISBN)
219,95 inkl. MwSt
Suitable for contractors and small businesses carrying out small works, this book contains information on various rates, each broken down to labour, material overheads and profit. It includes project costs for: rainwater goods installations; bathrooms external waste systems; central heating systems; and hot and cold water systems.
All the cost data you need to keep your estimating accurate, competitive and profitable.Do you work on jobs between 50 and 50,000? - Then this book is for you.Specially written for contractors and small businesses carrying out small works, Spon's Estimating Cost Guide to Plumbing and Heating contains accurate information on thousands of rates each broken down to labour, material overheads and profit.The first book to include typical project costs for:

rainwater goods installations
bathrooms
external waste systems
central heating systems
hot and cold water systems.

Bryan Spain is a consultant quantity surveyor who specialises in building and civil engineering costs. He has worked in local government, private practice and contracting organisations. He has also written over 50 books, mainly on construction costs.

Preface. Introduction. Part One: Unit Rates. Lead Sheet Coverings. Sanitary Appliances/Fittings. Holes, Chases, Covers and Supports for Services. Rainwater Pipework/Gutters. Drainage Above Ground. Drainage Below Ground. Hot and Cold Water. Gas/Oil Fired Boilers. Raidators. Alteration Work. Part Two: Project Costs. PVC-U Rainwater Goods. One-storey Gable End. Two-storey Gable End. Three-storey Gable End. One-storey Hipped End. Two-storey Hipped End. Detached, Overall 9 x 8m. Three-storey Hipped End. Cast Iron Rainwater Goods. One-storey Gabel End. Two-storey Gable End. Three-storey Gable End. One-storey Hipped End. Two-storey Hipped End. Three-storey Hipped End. Aluminium Rainwater Goods. One-storey Gable End. Two-storey Gable End. Three-storey Gable End. One-storey Hipped End. Two-storey Hipped End. Three-storey Hipped End. Summary of Rainwater Goods Project Costs. Bathrooms. External Wastes. Central Heating Systems. Hot and Cold Water Supply Systems. Part Three: Business Matters. Starting a Business. Running a Business. Taxation. Part Four: General Data. General Construction Data. Index.

Erscheinungsdatum
Reihe/Serie Spon's Estimating Costs Guides
Verlagsort London
Sprache englisch
Maße 152 x 229 mm
Gewicht 453 g
Themenwelt Naturwissenschaften Biologie Ökologie / Naturschutz
Technik Bauwesen
Technik Maschinenbau
Technik Umwelttechnik / Biotechnologie
ISBN-10 1-138-40858-1 / 1138408581
ISBN-13 978-1-138-40858-6 / 9781138408586
Zustand Neuware
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich