Critical Pathways in Therapeutic Intervention
Upper Extremities
Seiten
1996
Mosby (Verlag)
978-0-8151-4486-1 (ISBN)
Mosby (Verlag)
978-0-8151-4486-1 (ISBN)
- Titel ist leider vergriffen;
keine Neuauflage - Artikel merken
Presents ideas and concepts from sports medicine, physiotherapy, occupational therapy, geriatrics, ergonomics, kinesiology and physiatry to offer rehabilitation methods to be considered before surgical intervention. This work covers many of the maladies most commonly seen in outpatient rehabilitation.
Unique in its approach to rehabilitation, "Critical Pathways" pulls ideas and concepts from sports medicine, physiotherapy, occupational therapy, geriatrics, ergonomics, kinesiology and physiatry to offer conservative rehabilitation methods to be considered before surgical intervention. The case study format promotes critical thinking by stimulating real encounters with patients and covering many of the maladies most commonly seen in outpatient rehabilitation. Each case study provides the necessary paradigm clinical data, as well as results of clinical tests needed for a successful evaluation of commonly seen pathologies. Chapters are organised into 5 major areas: hand and wrist, elbow and forearm, shoulder, brachial plexus/thoracic outlet/shoulder girdle andnerve, and muscle legions.
Unique in its approach to rehabilitation, "Critical Pathways" pulls ideas and concepts from sports medicine, physiotherapy, occupational therapy, geriatrics, ergonomics, kinesiology and physiatry to offer conservative rehabilitation methods to be considered before surgical intervention. The case study format promotes critical thinking by stimulating real encounters with patients and covering many of the maladies most commonly seen in outpatient rehabilitation. Each case study provides the necessary paradigm clinical data, as well as results of clinical tests needed for a successful evaluation of commonly seen pathologies. Chapters are organised into 5 major areas: hand and wrist, elbow and forearm, shoulder, brachial plexus/thoracic outlet/shoulder girdle andnerve, and muscle legions.
Erscheint lt. Verlag | 23.12.1996 |
---|---|
Zusatzinfo | 196 ills |
Verlagsort | London |
Sprache | englisch |
Maße | 191 x 235 mm |
Gewicht | 754 g |
Themenwelt | Medizin / Pharmazie ► Medizinische Fachgebiete ► Chirurgie |
Medizin / Pharmazie ► Physiotherapie / Ergotherapie ► Behandlungstechniken | |
ISBN-10 | 0-8151-4486-5 / 0815144865 |
ISBN-13 | 978-0-8151-4486-1 / 9780815144861 |
Zustand | Neuware |
Haben Sie eine Frage zum Produkt? |
Mehr entdecken
aus dem Bereich
aus dem Bereich
Buch | Softcover (2021)
Urban & Fischer in Elsevier (Verlag)
54,00 €