![Für diesen Artikel ist leider kein Bild verfügbar.](/img/platzhalter480px.png)
Critical Paths
Duke University Press (Verlag)
978-0-8223-0751-8 (ISBN)
- Keine Verlagsinformationen verfügbar
- Artikel merken
Through the essays themselves and in the reaction they will certainly provoke, Critical Paths will bring increased theoretical awareness to the study of Blake and will further the ongoing redefinition of Blake's art. At the same time, the collection investigates the general problem of methodology in literary studies by means of a casebook examination of modern critical approaches. Blake criticism and current literary theory here come together; the encounter illuminates and enriches both.
Illustrations ix
Key to References xi
Acknowledgments xiii
Introduction / Dan Miller 1
Methods and Limitations / Stephen D. Cox 19
Synecdoche and Method / Hazard Adams 41
Blake's Revisionism: Gnostic Interpretation and Critical Methodology / William Dennis Horn 72
Literal/Tiriel/Material / Nelson Hilton 99
Blake's De-Formation of Neo-Aristotelianism / Donald Ault 111
Blake and the Deconstructive Interlude / Dan Miller 139
Rouzing the Faculties: Lacanian Psychoanalysis and the Marriage of Heaven and Hell in the Reader / Mark Bracher 168
Blake, Women, and Sexuality / Brenda S. Webster 204
Blake's Feminist Revision of Literary Tradition in "The SICK ROSE" / Elizabeth Langland 225
Representations of Revolution: From The French Revolution to The Four Zoas / David Aers 244
"in vain the Eloquent tongue": An Un-Reading of VISIONS of the Daughters of Albion / Thomas A. Vogler 271
Afterword / David Wagenknecht 310
Notes 329
Index 369
Contributors 381
Erscheint lt. Verlag | 18.11.1987 |
---|---|
Verlagsort | North Carolina |
Sprache | englisch |
Gewicht | 862 g |
Themenwelt | Literatur ► Lyrik / Dramatik ► Lyrik / Gedichte |
Geisteswissenschaften ► Sprach- / Literaturwissenschaft ► Anglistik / Amerikanistik | |
Geisteswissenschaften ► Sprach- / Literaturwissenschaft ► Literaturgeschichte | |
Geisteswissenschaften ► Sprach- / Literaturwissenschaft ► Literaturwissenschaft | |
ISBN-10 | 0-8223-0751-0 / 0822307510 |
ISBN-13 | 978-0-8223-0751-8 / 9780822307518 |
Zustand | Neuware |
Haben Sie eine Frage zum Produkt? |
aus dem Bereich